Main Page
Physics with a Neutral Particle Spectrometer in Hall C
NPS Experiments
Collaboration
Mailing Lists
NPS LOGO
Meetings
Documents
NPS Subsystems
NPS Assembly
DAQ in EEL 108
How to run the DAQ in EEL building room 108.
user: hccoda Password is posted near the screen computer: cdaql3
Start/stop runs
Usually the DAQ is already running one of the workspaces on cdaql3 (giant screen). Then it's like any other CODA system. Stop/start runs with the Run Control GUI (rcgui).
How to CODA start from scratch.
On hccoda@cdaql3, type "startCoda" (note the capital C). The xterms with components pops up. Those are the 3 crates nps-vme1, nps-vme2, nps-vme3, as well as the event builder PEB1. The Run Control GUI (rcgui) pops up. We normally want the configuration "NPS_3crate" for the aforementioned crates. We also have single-VME configs ("vme1", "vme2", "vme3") but they only work if the trigger is plugged into the master TI. More on trigger below.
- FADC parameters are defined in the usual config file
ssh -X nps-vme1 -l hccoda cd cfg and see nps-vmeN.cfg where N = 1, 2, 3 Please don't modify these unless you know what you are doing.
Trigger
Curently (Jan 24, 2023) the trigger is a front-panel trigger going into the 7th input of the TI-master. This input is labelled "TS#1". Later we'll have a fancy VTP trigger and I'll update this. But currently the trigger consists of the "and" between a scintillator on top and bottom of the calorimeter. And each scintillator is the "or" of the two PMTs that are connected to the two ends of the scintillator.
NPS Controls
NPS Software
NPS Log Book
NPS ERR
Announcements
- NPS Collaboration Meeting on 2-3 February (in-person component at JLab) from 8am - 1pm ET
- NPS General phone meeting on Thursday TBD
- DAQ/Electronic and Analyzer meeting