Main Page
Jump to navigation
Jump to search
Physics with a Neutral Particle Spectrometer in Hall C
NPS Experiments
Collaboration
Mailing Lists
NPS LOGO
Pictures
Meetings
NPS Log Book
NPS Redmine
NPS Assembly
NPS Kinematics
NPS Installation
NPS De-Installation
DAQ in EEL 108
- see also CODA - EEL Configuration
NPS DAQ in Hall C
- this configuration is before integration with HMS DAQ
NPS Controls
NPS Software
NPS RG1a Analysis
Meeting minutes, agenda, and schedule
ELOG: We use this software for offline analysis results.
Redmine (online analysis only): We no longer use this software, but it is linked here for a keepsake.
Online Data
Documents
NPS Subsystems
NPS ERR
Announcements
- NPS Phase 1 RC Meetings: daily at 11:00AM ET
- Hall C logbook: HCLog
- Hall C Wiki: NPS Running experiments
- NPS General 1-hour phone meeting (monthly): TBD at 9:00AM ET
- Please post slides/reports in the NPS Wiki "Meetings" section (see above)