EJFAT EPSCI Meeting Apr. 19, 2023
Jump to navigation
Jump to search
The meeting time is 2:30pm.
Connection Info:
You can connect using Teams Link. (Click "Expand" to the right for details -->):
Agenda:
- Previous meeting
- Announcements:
- NERSC Test Development:
- Data Source:
- JLAB, CLAS12, pre-event aggregated - 1 channel
- Front End Packetizer pending mods for Tick-sync msg to CP - UDP packet to port on CP Host
- Derek Howard (ESnet) to build CP for EJFAT and Perlmutter at NERSC with JLab assisting
- Week of 2/13:
- Finish mock API server
- Create an internal representation of the load balancer calendar
- Implement the algorithm specified in "EJFAT Load Balancer Schedule Density from Reassembly Engine PID control"
- Week of 2/20: Other ESnet projects
- Week of 2/27: Add integration for the SmartNIC P4 Controller, synchronizing the internal state of the gRPC server with the P4 tables.
- Week of 3/6: Other ESnet projects
- Week of 3/13: Start work on integration test tooling.
- JLab to supply Event reception journaling tool
- Week of 3/20: Other ESnet projects
- Week of 3/27: CP Development
- Week of 4/02: Other ESnet projects
- Week of 4/07: Integration Testing
- Week of 4/16: Other ESnet projects
- Week of 2/13:
- Data Sink:
- Perlmutter
- ERSAP
- Networking for Test
- L3VPN Design with ESNet (done)
- Configure L3VPN, establish peering (in progress)
- Vet the cybersecurity controls with the security group. (in progress)
- Relocate to HACS-4
- Configure hosts to use tunnel, confirm traffic flow is as expected
- Implement Local network configuration changes/cybersecurity controls
- Test Plans - JLab, ESnet, NERSC:
- Data Source:
- RT2022 Paper: Submission Process Complete
- ACAT2022 Paper: - submitted
- Demo Ready EJFAT Instance
- EJFAT Operational Status Board -> Prometheus Reporting
- Hall B CLAS12 FT detector streaming test
- Resources:
- AOT