EJFAT Group Meeting Jan. 13, 2022
Jump to navigation
Jump to search
The meeting time is 11:00am.
Connection Info:
You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon Meeting ID 161 012 5238 Passcode 503371 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Issues for Discussion:
- Status of P4 code update for packet checksum (ESnet)
- Status of new bitfile for UDP-LB U280 FPGA (ESnet)
- Status of Edge to Core Test Design
- ERSAP / CLARA Data Generation for UDP-LB (Vardan)
- UDP-LB Meta Data Insertion / Packetizer (Carl)
- UDP-LB Emulator (Mike)
- UDP-RE Source Data Protocol Termination / Reassembly (Carl)
- Test Plans / Goals (Mike)
- Configuration of network switches and Host CPU for FPGA LB (does not respond to arp messages)
- Network switches: What speed should those links be - 100G or 400G - and how many? (Bryan/Brent/Amotoj/ESnet)
- Status of PO for Edge to Core Test Equipment (Amotoj)
- Status of PO for Network Equipment (Brent)
- AOT
Minutes:
- Should not us indra-s[1,3] for EJFAT Testing - D. Abbott can recommend alternate hosts
- May need to purchase some 100 Gbs NICs for alternate hosts
- DAQ subnet to be expanded for EJFAT/HPDC testing
- Need 100 Gbs switch
- fibre between DAQ labs
Attendees:
- M. S. Goodrich
- D. Lawrence
- G. Heyes
- S. Sheldon (ESnet)
- C. Timmer
- V. Gyurjyan
- B. Hess
- A. Singh
- B. Morris