Difference between revisions of "EJFAT Group Meeting Jan. 13, 2022"

From epsciwiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 43: Line 43:
 
#** UDP-LB Emulator (Mike)
 
#** UDP-LB Emulator (Mike)
 
#** UDP-RE Source Data Protocol Termination / Reassembly (Carl)
 
#** UDP-RE Source Data Protocol Termination / Reassembly (Carl)
#* Configuration of network switches and Host CPU for FPGA LB (Bryan)
+
#** Test Plans / Goals (Mike)
 +
#* Configuration of network switches and Host CPU for FPGA LB (does not respond to arp messages)
 
#* Network switches: What speed should those links be - 100G or 400G - and how many? (Bryan/Brent/Amotoj/ESnet)
 
#* Network switches: What speed should those links be - 100G or 400G - and how many? (Bryan/Brent/Amotoj/ESnet)
 
#* Status of PO for Edge to Core Test Equipment (Amotoj)
 
#* Status of PO for Edge to Core Test Equipment (Amotoj)
Line 55: Line 56:
 
=== Minutes: ===
 
=== Minutes: ===
 
<ul>
 
<ul>
 +
<li>Should not us indra-s[1,3] for EJFAT Testing - D. Abbott can recommend alternate hosts
 +
<li>May need to purchase some 100 Gbs NICs for alternate hosts
 +
<li>DAQ subnet to be expanded for EJFAT/HPDC testing
 +
<ul>
 +
<li>Need 100 Gbs switch
 +
<li>fibre between DAQ labs
 +
</ul>
 
</ul>
 
</ul>
  
 
=== Attendees: ===
 
=== Attendees: ===
 
<ul>
 
<ul>
 +
<li>M. S. Goodrich
 +
<li>D. Lawrence
 +
<li>G. Heyes
 +
<li>S. Sheldon (ESnet)
 +
<li>C. Timmer
 +
<li>V. Gyurjyan
 +
<li>B. Hess
 +
<li>A. Singh
 +
<li>B. Morris
 
</ul>
 
</ul>

Latest revision as of 15:36, 20 January 2022

The meeting time is 11:00am.

Connection Info:

You can connect using ZoomGov Video conferencing (ID: 161 012 5238). (Click "Expand" to the right for details -->):

Meeting URL
 https://jlab-org.zoomgov.com/j/1610125238?pwd=QnEvcjV6VFFndWZsQW15SmJKU0RJZz09&from=addon

Meeting ID
161 012 5238

Passcode
503371

Want to dial in from a phone?

Dial one of the following numbers:
US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free)

Enter the meeting ID and passcode followed by #

Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode

Agenda:

  1. Previous meeting
  2. Issues for Discussion:
    • Status of P4 code update for packet checksum (ESnet)
    • Status of new bitfile for UDP-LB U280 FPGA (ESnet)
    • Status of Edge to Core Test Design
      • ERSAP / CLARA Data Generation for UDP-LB (Vardan)
      • UDP-LB Meta Data Insertion / Packetizer (Carl)
      • UDP-LB Emulator (Mike)
      • UDP-RE Source Data Protocol Termination / Reassembly (Carl)
      • Test Plans / Goals (Mike)
    • Configuration of network switches and Host CPU for FPGA LB (does not respond to arp messages)
    • Network switches: What speed should those links be - 100G or 400G - and how many? (Bryan/Brent/Amotoj/ESnet)
    • Status of PO for Edge to Core Test Equipment (Amotoj)
    • Status of PO for Network Equipment (Brent)
  3. AOT



Minutes:

  • Should not us indra-s[1,3] for EJFAT Testing - D. Abbott can recommend alternate hosts
  • May need to purchase some 100 Gbs NICs for alternate hosts
  • DAQ subnet to be expanded for EJFAT/HPDC testing
    • Need 100 Gbs switch
    • fibre between DAQ labs

Attendees:

  • M. S. Goodrich
  • D. Lawrence
  • G. Heyes
  • S. Sheldon (ESnet)
  • C. Timmer
  • V. Gyurjyan
  • B. Hess
  • A. Singh
  • B. Morris