Difference between revisions of "EJFAT EPSCI Meeting Aug. 14, 2024"
Jump to navigation
Jump to search
(Created page with "The meeting time is 2:30pm. === Connection Info: === <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https://teams.microsoft.com/l/meetup-join/19%...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 27: | Line 27: | ||
#: | #: | ||
# Announcements: | # Announcements: | ||
+ | ## ejfat-1 LB up and should behave the same as ESnet Stable LB | ||
# Topics | # Topics | ||
## [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit IRI Test Development]: | ## [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit IRI Test Development]: | ||
− | ### LB version = | + | ### LB version = ESnet '''Stable''' version |
### Data Source: | ### Data Source: | ||
#### JLAB, CLAS12, pre-triggered events - 1 channel | #### JLAB, CLAS12, pre-triggered events - 1 channel | ||
Line 39: | Line 40: | ||
### [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk Test Plans - JLab, ESnet, NERSC:] | ### [https://docs.google.com/document/d/13VvyCMNJW3nIVZMgqOuPn3MBSLmfAl1zLkJAHw8fj04/edit?usp=drivesdk Test Plans - JLab, ESnet, NERSC:] | ||
### Prometheus Dashboards | ### Prometheus Dashboards | ||
− | |||
− | |||
− | |||
## JLab FEG/SRO - will use interim UDP solution for event sync - '''heats up in August (?)''' | ## JLab FEG/SRO - will use interim UDP solution for event sync - '''heats up in August (?)''' | ||
## E2SAR - e2sar/ibaldin:0.1.0a6 available - segmentation done, reassembly not completed yet | ## E2SAR - e2sar/ibaldin:0.1.0a6 available - segmentation done, reassembly not completed yet | ||
## IB | ## IB | ||
− | # Administrivia | + | # System / Administrivia |
− | ## ejfat-3 - needs configuration corrections for networking, routing, mounting /daqfs - should't be used until further notice | + | ## ejfat-3 - needs configuration corrections for networking, routing, mounting /daqfs - '''should't be used until further notice''' |
## [https://www.overleaf.com/project/667d9fa6b50f340b46026ba3 ACAT 2024 Paper] submission deadline extended to '''Aug 18, 2024''' | ## [https://www.overleaf.com/project/667d9fa6b50f340b46026ba3 ACAT 2024 Paper] submission deadline extended to '''Aug 18, 2024''' | ||
− | ## Awaiting TLS cert install across cluster | + | ## <s>Awaiting TLS cert install across cluster</s> - '''Done''' |
+ | ## Turn machines over to sys admin/Puppet - <s>except for ejfat-fs</s> | ||
+ | ## [https://jeffersonlab-my.sharepoint.com/:b:/g/personal/baldin_jlab_org/EaFbLl6TB9BBkA7bG7SwxAwB1_V5HB2rcPNH9KKY846NkQ?e=T1m0q5 SC poster '''submitted'''] | ||
+ | ## SSD drives on ejfat-fs - 20TB used of 28TB - mount for EJFAT farm access probably ZFS/Raid for data preservation | ||
## Ram Disks: 1TB Total Mem on ejfat-fs, 0.5 TB others | ## Ram Disks: 1TB Total Mem on ejfat-fs, 0.5 TB others | ||
− | ## | + | ## Lustre storage for EJFAT |
− | |||
− | |||
# Resources: | # Resources: | ||
## [https://jeffersonlab.sharepoint.com/sites/HPDF HPDF] | ## [https://jeffersonlab.sharepoint.com/sites/HPDF HPDF] | ||
## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/E2SAR.drawio.pdf?csf=1&web=1&e=rejQL5 '''EJFAT API'''] | ## [https://jeffersonlab.sharepoint.com/:b:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/E2SAR.drawio.pdf?csf=1&web=1&e=rejQL5 '''EJFAT API'''] | ||
+ | ## [https://wiki.jlab.org/epsciwiki/index.php/EJFAT#EJFAT_System_Status EJFAT Status] | ||
# AOT | # AOT | ||
<hr> | <hr> |
Latest revision as of 18:58, 14 August 2024
The meeting time is 2:30pm.
Connection Info:
You can connect using Teams Link. (Click "Expand" to the right for details -->):
Agenda:
- Previous meeting
- Announcements:
- ejfat-1 LB up and should behave the same as ESnet Stable LB
- Topics
- IRI Test Development:
- LB version = ESnet Stable version
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Data Sink:
- Perlmutter - 40 nodes
- ORNL/ESnet/JLab IRI Testbed / Defiant - 4 nodes allocated
- JLab - 7 nodes available
- ERSAP
- Test Plans - JLab, ESnet, NERSC:
- Prometheus Dashboards
- JLab FEG/SRO - will use interim UDP solution for event sync - heats up in August (?)
- E2SAR - e2sar/ibaldin:0.1.0a6 available - segmentation done, reassembly not completed yet
- IB
- IRI Test Development:
- System / Administrivia
- ejfat-3 - needs configuration corrections for networking, routing, mounting /daqfs - should't be used until further notice
- ACAT 2024 Paper submission deadline extended to Aug 18, 2024
Awaiting TLS cert install across cluster- Done- Turn machines over to sys admin/Puppet -
except for ejfat-fs - SC poster submitted
- SSD drives on ejfat-fs - 20TB used of 28TB - mount for EJFAT farm access probably ZFS/Raid for data preservation
- Ram Disks: 1TB Total Mem on ejfat-fs, 0.5 TB others
- Lustre storage for EJFAT
- Resources:
- AOT