Difference between revisions of "EJFAT Group Meeting Nov 7, 2024"
Jump to navigation
Jump to search
m (→Agenda:) |
|||
Line 40: | Line 40: | ||
## [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit IRI Test Development]: | ## [https://docs.google.com/document/d/1CsBtDZEhK4k9POSeiLF4kzTQVMl7KwZtubVH-aEIyo4/edit IRI Test Development]: | ||
### [https://jeffersonlab.sharepoint.com/:i:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/iri-10-10-24.png?csf=1&web=1&e=0ok6Ox Last Test Thursday Oct 10] | ### [https://jeffersonlab.sharepoint.com/:i:/r/sites/SciComp/Shared%20Documents/EPSCI/EJFAT/iri-10-10-24.png?csf=1&web=1&e=0ok6Ox Last Test Thursday Oct 10] | ||
− | ### Next Test ????? | + | ### Next Test Date/Time = ????? |
− | ### | + | #### ESnet Beta Lineup on FPGAs: FW @ 3aa897b2 + HW @ 57684 |
+ | #### CP version = latest develop ??? | ||
### Data Source: | ### Data Source: | ||
#### JLAB, CLAS12, pre-triggered events - 1 channel | #### JLAB, CLAS12, pre-triggered events - 1 channel | ||
Line 54: | Line 55: | ||
## JLab FEG/SRO | ## JLab FEG/SRO | ||
### will use interim UDP solution for event sync | ### will use interim UDP solution for event sync | ||
− | ### Special Events Issue - | + | ### Special Events Issue - Completely Out-of-band |
#### Cloud Based message queue | #### Cloud Based message queue | ||
#### LB isolation from any non-LB processing | #### LB isolation from any non-LB processing | ||
Line 66: | Line 67: | ||
# [https://wiki.jlab.org/epsciwiki/index.php/EJFAT Status] | # [https://wiki.jlab.org/epsciwiki/index.php/EJFAT Status] | ||
## ejfat-1 - 2-port LAG at switch | ## ejfat-1 - 2-port LAG at switch | ||
− | ## ejfat-3 - two FPGA DP built, running - | + | ## ejfat-3 - two FPGA DP built, running - 4-port LAG at switch, FW containers built (Stacey), needs CP installation |
− | ## ejfat-6 - Ubuntu 24.04 installed - esnet-smartnic-fw build | + | ## ejfat-6 - Ubuntu 24.04 installed - esnet-smartnic-fw build succeeds with podman, issues with podman compose |
## /dev/sdb is now mounted on all systems at /scratch, with the exception of EJFAT-4. | ## /dev/sdb is now mounted on all systems at /scratch, with the exception of EJFAT-4. | ||
# EJFAT Phase II | # EJFAT Phase II |
Latest revision as of 15:30, 7 November 2024
The meeting time is 11:00am Eastern/USA.
Connection Info:
You can connect using [ https://jlab-org.zoomgov.com/j/1611828967?pwd=UVVCS0pUVW5FMlphT0lRQXdoQ0o4Zz09&from=addon ZoomGov Video conferencing (ID: 161 012 5238)]. (Click "Expand" to the right for details -->):
Meeting URL https://jlab-org.zoomgov.com/j/1611828967 Meeting ID 161 182 8967 Passcode 570041 Want to dial in from a phone? Dial one of the following numbers: US: +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements:
- SuperComputing24 Atlanta, GA from Nov 17-22, 2024
- Mike PD Duty 11/06/2024 - 11/20/2024
- Topics
- IRI Test Development:
- Last Test Thursday Oct 10
- Next Test Date/Time = ?????
- ESnet Beta Lineup on FPGAs: FW @ 3aa897b2 + HW @ 57684
- CP version = latest develop ???
- Data Source:
- JLAB, CLAS12, pre-triggered events - 1 channel
- Data Sink:
- Perlmutter - 80 nodes
- ORNL/ESnet/JLab IRI Testbed / Defiant - 4 nodes allocated
- JLab - 7 nodes available
- FABRIC - nodes available
- ERSAP
- Test Plans - JLab, ESnet, NERSC:
- ALS: Next is Tech Talk
- JLab FEG/SRO
- will use interim UDP solution for event sync
- Special Events Issue - Completely Out-of-band
- Cloud Based message queue
- LB isolation from any non-LB processing
- Cloud solutions include Kafka and RabbitMQ, ...
- E2SAR 0.1.2
- segmentation/reassembly complete
- .deb packages for Ubuntu 20, 22 and 24 are now available (they contain E2SAR library, headers, executables as well as appropriate versions of gRPC and Boost dependencies, all installed under /usr/local), as well as the latest Docker image
- SC poster submitted - demo in works
- Experiment Halls - beam returns late January/February 2025
- Ubuntu 20.04 LTS - support ends in 2025 - next ESnet target 22.04
- IRI Test Development:
- Status
- ejfat-1 - 2-port LAG at switch
- ejfat-3 - two FPGA DP built, running - 4-port LAG at switch, FW containers built (Stacey), needs CP installation
- ejfat-6 - Ubuntu 24.04 installed - esnet-smartnic-fw build succeeds with podman, issues with podman compose
- /dev/sdb is now mounted on all systems at /scratch, with the exception of EJFAT-4.
- EJFAT Phase II
- AOT