Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 103: | Line 103: | ||
=== Bringing beam to the hall (consult with RC with any problem): === | === Bringing beam to the hall (consult with RC with any problem): === | ||
− | + | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA</b>. All studies should be done with beam currents between 25 nA and 30 nA. | |
− | |||
− | |||
− | |||
− | |||
− | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA</b>. All studies should be done with beam currents between 25 nA and 30 nA. | ||
#* If needed move SVT protection collimator up/down to see beam clearly on the downstream viewer (motion should not be more than a 1mm, the pre-set positions should be good to a few hundred micrometers). | #* If needed move SVT protection collimator up/down to see beam clearly on the downstream viewer (motion should not be more than a 1mm, the pre-set positions should be good to a few hundred micrometers). | ||
#* <b> Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational.</b> | #* <b> Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational.</b> | ||
Line 116: | Line 111: | ||
#* Mark the beam position on the chromox screen and turn on HPS chicane magnets. | #* Mark the beam position on the chromox screen and turn on HPS chicane magnets. | ||
#* Study rates on ECal channels as a function of beam current without and with production target. | #* Study rates on ECal channels as a function of beam current without and with production target. | ||
− | #* Check the FSD system (see procedures on the | + | #* Check the FSD system (see procedures on the Documentation page) |
− | # If beam stability and profile are acceptable, start | + | # If beam stability and profile are acceptable, start centring it on HPS SVT using SVT wires (see instructions under "Procedures" on the documentation tab for "Beamline"). |
# Start trigger rates studies, establish running conditions. | # Start trigger rates studies, establish running conditions. | ||
<!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | <!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | ||
Line 141: | Line 136: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
− | # <b> To establish good beam conditions</b> | + | # <b> To establish good beam conditions: </b> |
− | # | + | #* <font color='red'>Make sure SVT is completely OFF (see above)</font> |
− | # | + | #* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> |
− | ## Check the beam position on the tagger viewer, it should be approximately in the | + | #* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). |
− | ## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 should be <~0.1+/-0.05 mm, and on the tagger harp (2C24) <~0.35 +/- 0.1mm. | + | #* Check the beam position on the tagger viewer, it should be approximately in the centre of the screen |
− | # | + | #* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam establishing on the tagger dump and perform harp scans beam current should be <10 nA. |
− | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b | + | #* Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 should be <~0.1+/-0.05 mm, and on the tagger harp (2C24) <~0.35 +/- 0.1mm. |
− | #* If not, turn it on. Strictly follow the procedure in the beam line manual! | + | #* Halo counters UPS-L/R and TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3338763] |
+ | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | ||
+ | #* If not, turn it on. Strictly follow the procedure in the beam line manual!--> | ||
# <b> Before sending beam to the Faraday cup</b> | # <b> Before sending beam to the Faraday cup</b> | ||
− | #* Check | + | #* <b> Check that SVT protection collimator is on beam </b> |
− | #* | + | #* HPS target is OUT |
− | #* | + | #* SVT is OUT (position 0 mm) and voltages are OFF |
− | #* | + | #* ECal HV is OFF |
# <b> Send beam to the Faraday cup</b> | # <b> Send beam to the Faraday cup</b> | ||
+ | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA</b>. All studies should be done with beam currents between 25 nA and 30 nA. | ||
#* Ask MCC to establish 25 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration) | #* Ask MCC to establish 25 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration) | ||
#* Tune beam profile with 2H02A harp scan to be wide in X-direction and narrow in Y (see ref [https://logbooks.jlab.org/entry/3337720]) | #* Tune beam profile with 2H02A harp scan to be wide in X-direction and narrow in Y (see ref [https://logbooks.jlab.org/entry/3337720]) |
Revision as of 19:22, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |