# <b>First send beam to the tagger dump:</b> | # <b>First send beam to the tagger dump:</b> | ||
#* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | #* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | ||
− | #* Ask MCC to turn ON the tagger magnet | + | #* Ask MCC to turn ON the tagger magnet and then deliver <10 nA beam. |
#* Check the beam position on the tagger viewer, it should be approximately in the centre of the screen | #* Check the beam position on the tagger viewer, it should be approximately in the centre of the screen | ||
#* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | #* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. |
Revision as of 18:47, 2 March 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on Thursdays and Fridays at 2pm
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:To establish good beam conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |