Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 195: | Line 195: | ||
#* Insert the 4um W target without turning off the beam. | #* Insert the 4um W target without turning off the beam. | ||
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. ''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. ''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<!-- | <!-- | ||
Line 227: | Line 216: | ||
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | ||
--> | --> | ||
+ | |||
+ | |- | ||
+ | !align=left width=100% style="background:#eeeeee;"| | ||
+ | |||
+ | ===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== | ||
+ | # SVT HV will trip off automatically | ||
+ | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | ||
+ | #* If it was '''NOT''' an HPS halo counter trip, MCC should restore the beam on their own. As soon beam is back and stable, restore SVT HV. | ||
+ | #* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Inform MCC that we will get back to them when we are ready for beam. | ||
+ | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
+ | #*# Tell MCC we are ready for beam. | ||
+ | #*# Once beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. | ||
+ | #*# Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. | ||
+ | #*# Resume data taking. | ||
Revision as of 07:14, 3 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, Weekends Only
Shifts are manned from Friday 3pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Recovering from beam trips when running SVT at 0.5 mm:
| |
---|---|
Every Shift:
|
Every Run:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |