Line 132: | Line 132: | ||
# Record Data with 4um target | # Record Data with 4um target | ||
#* Use v7_200nAtrig. | #* Use v7_200nAtrig. | ||
+ | #* Be sure to follow General Guidelines, especially instructions for '''Every Shift''' and '''Every Run''' below. | ||
+ | #* Monitor and record BPM 2H02 history carefully to insure stable beams. | ||
+ | #** If beams are not stable, get MCC to fix it! | ||
+ | <!-- | ||
#* Save scalers, trigger gui, FADC display gui each run. | #* Save scalers, trigger gui, FADC display gui each run. | ||
− | |||
#* Do one 2H02 harp scan per shift; | #* Do one 2H02 harp scan per shift; | ||
#* Fill out BTA; | #* Fill out BTA; | ||
− | |||
− | |||
#* After each run execute this script (replace RunNb by the actual run number): | #* After each run execute this script (replace RunNb by the actual run number): | ||
#** <tt> hps2tape.sh RunNb</tt> | #** <tt> hps2tape.sh RunNb</tt> | ||
+ | --> | ||
# Beam current scan (to be scheduled by RC) | # Beam current scan (to be scheduled by RC) | ||
#* Take data at various currents: 50nA, 100nA, 250nA, 300nA ... | #* Take data at various currents: 50nA, 100nA, 250nA, 300nA ... | ||
Line 236: | Line 238: | ||
#* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | #* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | ||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
+ | #* Fill out BTA hourly | ||
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
# Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) | # Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) |
Revision as of 13:11, 3 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, Weekends Only
Shifts are manned from Friday 3pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Recovering from beam trips when running SVT at 0.5 mm:
| |
---|---|
Every Shift:
|
Every Run:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |