Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 184: | Line 184: | ||
#* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | #* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | ||
#* Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3376192],[https://logbooks.jlab.org/entry/3376194]) | #* Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3376192],[https://logbooks.jlab.org/entry/3376194]) | ||
− | #** Positions on both harps should be within | + | #** Positions on both harps should be within 1mm |
#** Width on 2C21 should be <~0.1+/-0.05 mm | #** Width on 2C21 should be <~0.1+/-0.05 mm | ||
− | #** Width on tagger harp (2C24) <~0.35 +/- 0.1mm | + | #** Width on tagger harp (2C24) <~0.35 +/- 0.1mm |
#* If beam is stable enough to perform harp scans, turn ECAL HV '''ON''' to monitor and log ECal rates | #* If beam is stable enough to perform harp scans, turn ECAL HV '''ON''' to monitor and log ECal rates | ||
#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] | #* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] |
Revision as of 14:48, 4 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Recovering from beam trips when running SVT at 0.5 mm:
| |
---|---|
Every Shift:
|
Every Run:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |