Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 156: | Line 156: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
+ | |||
+ | ===<font color=blue><b>DAQ RECOVERY</b></font>=== | ||
+ | # Reboot DAQ completely. | ||
+ | # If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | ||
+ | # If the DAQ is not recovered during 30 minutes, call Pele (Phone number?) | ||
+ | |||
=== Locking up the hall on Fridays === | === Locking up the hall on Fridays === | ||
* At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. | * At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. | ||
Line 204: | Line 210: | ||
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | ||
− | |||
− | |||
− | |||
− | |||
<!-- | <!-- |
Revision as of 07:56, 25 March 2016
[edit]
Spring 2016 @ 2 GeV:
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Valery Kubarovsky
- (757) 575-7540 OR (603) 868-8088
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Important Notes:
Recovering from beam trips when running SVT at 0.5 mm:
INSERT WHAT SVT TO DO DURING LONG DOWN |
General Instructions:DAQ RECOVERY
Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Every Shift:
|
Every Run:
|
---|
.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |