Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 94: | Line 94: | ||
</font></center> | </font></center> | ||
− | == RC: | + | == RC: Tim Nelson == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 116: | Line 116: | ||
--> | --> | ||
− | == Run Plan June | + | == Run Plan June 27, 2019 == |
− | # SVT DAQ work | + | Hot items: |
− | + | # SVT DAQ work - takes precedence when needed, work will likely be sporadic | |
+ | # SVT chiller swap - will need to coordinated with SVT activities that require powering hybrids | ||
+ | |||
+ | Schedule and plans: | ||
+ | # Plan to re-establish beam to Hall B starting from settings two nights ago | ||
+ | # Expect few hours down in afternoon due to site-wide power exercise from 2-3 | ||
+ | # During down will coordinate SVT DAQ work with chiller swap. Cannot power SVT hybrids without chiller but testing can still be done with FEBs. | ||
When there is stable beam: | When there is stable beam: | ||
# Let SVT Experts shake out SVT DAQ | # Let SVT Experts shake out SVT DAQ | ||
− | #* SVT running is still expert only; don't try to run with the SVT on without an expert | + | #* SVT running - including moving the SVT in - is still expert only; don't try to run with the SVT on without an expert |
# When no SVT work, take 2-cluster data with hps_v3_mult0_2gammas.trg at 150na with 4um target | # When no SVT work, take 2-cluster data with hps_v3_mult0_2gammas.trg at 150na with 4um target | ||
# remember to do HARP scans of 2H01 and 2H02 every shift! | # remember to do HARP scans of 2H01 and 2H02 every shift! |
Revision as of 08:08, 27 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Tim Nelson
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
Run Plan June 27, 2019Hot items:
Schedule and plans:
When there is stable beam:
Every Shift:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |