Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 125: | Line 125: | ||
Schedule and plans: | Schedule and plans: | ||
# Plan to re-establish beam to Hall B starting from settings established at 4:00AM June 30. | # Plan to re-establish beam to Hall B starting from settings established at 4:00AM June 30. | ||
+ | # Perform collimator scan to make sure the beam is centered on the collimator. Call beamline expert. | ||
Line 215: | Line 216: | ||
#** Width on 2C21 should be <~0.1+/-0.05 mm | #** Width on 2C21 should be <~0.1+/-0.05 mm | ||
#** Width on tagger harp (2C24) <~0.35 +/- 0.1mm | #** Width on tagger harp (2C24) <~0.35 +/- 0.1mm | ||
+ | #* Background levels on harp scan are comparable to those of previous scans. | ||
<!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]--> | <!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]--> | ||
<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | ||
Line 225: | Line 227: | ||
#* SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI) | #* SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI) | ||
#* If any uncertainty, page the experts | #* If any uncertainty, page the experts | ||
− | |||
#* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3689166]. Make sure their values don't differ more than 100%. If there is such difference, tell MCC about this. | #* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3689166]. Make sure their values don't differ more than 100%. If there is such difference, tell MCC about this. | ||
# ''' Send beam to the Faraday cup ''' | # ''' Send beam to the Faraday cup ''' | ||
Line 246: | Line 247: | ||
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<!-- | <!-- |
Revision as of 14:00, 7 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
Run Plan July 6-7, 2019Hot items:
Schedule and plans:
Every Shift:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |