Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 296: | Line 296: | ||
==Every Run:== | ==Every Run:== | ||
# After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
− | # Update the | + | # Update the [https://docs.google.com/spreadsheets/d/1Ru4weeIOqtcpebiXKxFGCbPXGWXZF-W2JAolHcpvIFU/edit#gid=43855609 Run Spreadsheet] |
# Log screenshots of: | # Log screenshots of: | ||
#* main scaler_hps display | #* main scaler_hps display | ||
#* ECAL FADC rate gui | #* ECAL FADC rate gui | ||
#* Trigger rate gui | #* Trigger rate gui | ||
− | #* SVT and ECAL Monitoring pdfs | + | #* SVT and HODOSCOPE and ECAL Monitoring pdfs |
− | |||
− | |||
− | |||
− | |||
|} | |} |
Revision as of 14:27, 7 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Takashi Maruyama
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
Run Plan July 6-7, 2019Hot items:
Schedule and plans:
Every Shift:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |