Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 123: | Line 123: | ||
<font color=red> SVT DAQ work has a priority now, any time SVT experts request any changes in DAQ or beam, | <font color=red> SVT DAQ work has a priority now, any time SVT experts request any changes in DAQ or beam, | ||
the program needs to be stopped and continued as SVT experts Matt. G. or Cameroon will tell. </font> | the program needs to be stopped and continued as SVT experts Matt. G. or Cameroon will tell. </font> | ||
− | + | <!-- | |
# Continue the Run 9870 until Andrea will ask for the DAQ. | # Continue the Run 9870 until Andrea will ask for the DAQ. | ||
#* Andrea then will take an LED Run, and then will take another short Run to check new Gains | #* Andrea then will take an LED Run, and then will take another short Run to check new Gains | ||
Line 151: | Line 151: | ||
#* Target: 4 microns W | #* Target: 4 microns W | ||
#* Current: 100 nA | #* Current: 100 nA | ||
+ | --> | ||
<!-- | <!-- | ||
# When no SVT work, run with ECal and hodoscope: | # When no SVT work, run with ECal and hodoscope: |
Revision as of 00:12, 19 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%.
Run Plan July 18-19, 2019Hot items:
=================== task consequence ===============SVT DAQ work has a priority now, any time SVT experts request any changes in DAQ or beam, the program needs to be stopped and continued as SVT experts Matt. G. or Cameroon will tell.
Every Shift:
Every Run:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |