Line 165: | Line 165: | ||
#*Once stable beam is being delivered to the Faraday cup with orbit locks on for a known good trajectory, and the SVT collimator is in position, the FEBs and hybrids can be powered and operated, but the HV bias for the sensors must remain off. | #*Once stable beam is being delivered to the Faraday cup with orbit locks on for a known good trajectory, and the SVT collimator is in position, the FEBs and hybrids can be powered and operated, but the HV bias for the sensors must remain off. | ||
#*In order to turn on the HV, the FSD system must be functioning so a beam excursion that hits the collimator will quickly trip off the beam. | #*In order to turn on the HV, the FSD system must be functioning so a beam excursion that hits the collimator will quickly trip off the beam. | ||
− | |||
− | |||
| valign=top | | | valign=top | | ||
Line 174: | Line 172: | ||
<!--===DAQ RECOVERY=== | <!--===DAQ RECOVERY=== | ||
If DAQ crashed/broken: | If DAQ crashed/broken: | ||
− | # For every | + | # For every DAQ crash login into clondaq3 as a clasrun then run the following command |
#* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png]) | #* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png]) | ||
# [[HPS DAQ Reboot Procedure|Reboot DAQ completely.]]. | # [[HPS DAQ Reboot Procedure|Reboot DAQ completely.]]. | ||
Line 181: | Line 179: | ||
===Establishing Physics Quality Beam for HPS:=== | ===Establishing Physics Quality Beam for HPS:=== | ||
# <font color='red'>'''Make sure SVT is retracted and detectors, SVT, Hodoscope and ECAL are OFF.'''</font> | # <font color='red'>'''Make sure SVT is retracted and detectors, SVT, Hodoscope and ECAL are OFF.'''</font> | ||
− | # <b> | + | # <b>If beam was off for 8 hours or more or in cas of troublesome beam tuning, send beam to the tagger dump:</b> |
#* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | #* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | ||
#* Position "Blank" on the beam for the Hall-B collimator | #* Position "Blank" on the beam for the Hall-B collimator |
Revision as of 15:18, 7 August 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Raphael Dupre
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%.
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc
Run Plan August 7-12, 2019
Every Shift:
Every Run:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |