Difference between revisions of "The HPS Run Wiki"
Line 123: | Line 123: | ||
*# Low luminosity run, 8 um target, 120 nA beam current, trigger "hps_v12_1.trg" - 2x4 hour runs | *# Low luminosity run, 8 um target, 120 nA beam current, trigger "hps_v12_1.trg" - 2x4 hour runs | ||
*# FEE run, 20 um target, 120 nA, trigger TBD (Nathan) - 1x2 hour run | *# FEE run, 20 um target, 120 nA, trigger TBD (Nathan) - 1x2 hour run | ||
− | *# Straight track run, setup with 2H02 wire - | + | *# Run with different SVT positions, 20 um target, 120 nA beam current, trigger "hps_v12_1.trg" - 8 hours |
+ | *# Straight track run, setup with 2H02 wire, trigger "hps_v6_FEE_STRAIGHT.trg" - 1 hour, about 20M events | ||
* Take production data with PROD66 (PROD67) / hps_v12_1.trg 20um target at 120 nA, HPS collimator 3.94 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. | * Take production data with PROD66 (PROD67) / hps_v12_1.trg 20um target at 120 nA, HPS collimator 3.94 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. | ||
** After run starts run the script "ben-trigger-structure.sh [CURRENT RUN NUMBER]" on any clonPCs and make sure pop-up graph shows continuous decanting distribution, does not have peaks (bumps). If peaks will show up, make a log entry with the graph. | ** After run starts run the script "ben-trigger-structure.sh [CURRENT RUN NUMBER]" on any clonPCs and make sure pop-up graph shows continuous decanting distribution, does not have peaks (bumps). If peaks will show up, make a log entry with the graph. |
Revision as of 15:50, 6 September 2019
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Adendum to RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=-0.5,Y=1.5) and on 2H02(X=-1.55,Y=-0.4). Use the 2.82 mm SVT collimator
am profile check once a day, at 9 am, using 2H02 and SVT wire harps
Run Plan September 6 - 9, 2019
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |