Difference between revisions of "The HPS Run Wiki"
Line 548: | Line 548: | ||
*#** CLON_HOST is machine running the VNC server | *#** CLON_HOST is machine running the VNC server | ||
*#** VNC_PORT is the port number for the VNC server | *#** VNC_PORT is the port number for the VNC server | ||
+ | *#** 5918 is the port number on the hall gateway. It can be any number in the range 5900-5999 but cannot be shared with simultaneous connections from other users. | ||
*# Connect your local VNC client to that server: | *# Connect your local VNC client to that server: | ||
*#* e.g. <tt>vncviewer localhost:VNC_PORT</tt> | *#* e.g. <tt>vncviewer localhost:VNC_PORT</tt> |
Revision as of 07:11, 14 June 2021
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 20152019 HPS production triggers descriptionsHPS Upgrade ERRCOO, ESAD, RSAD Adendum to RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=-0.5,Y=1.5) and on 2H02(X=-1.55,Y=-0.4). Use the 2.82 mm SVT collimator
am profile check once a day, at 9 am, using 2H02 and SVT wire harps
Run Plan September 8 - 9, 2019
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Add documentation for remote shifts here!
- VNC
- Get a VNC client
- OSX: https://www.realvnc.com/en/connect/download/viewer/macos/
- Linux: TigerVNC, etc.
- Create an ssh tunnel through the 2-factor gateway to the machine running the VNC server in the Hall B counting house:
- ssh -L VNC_PORT:localhost:5918 CUE_USER@hallgw.jlab.org -t ssh -L 5918:localhost:VNC_PORT CLON_USER@CLON_HOST
- CUE_USER is your JLab CUE account
- CLON_USER is the standard user used to run shifts in the counting house
- CLON_HOST is machine running the VNC server
- VNC_PORT is the port number for the VNC server
- 5918 is the port number on the hall gateway. It can be any number in the range 5900-5999 but cannot be shared with simultaneous connections from other users.
- ssh -L VNC_PORT:localhost:5918 CUE_USER@hallgw.jlab.org -t ssh -L 5918:localhost:VNC_PORT CLON_USER@CLON_HOST
- Connect your local VNC client to that server:
- e.g. vncviewer localhost:VNC_PORT
- Get a VNC client