<center> <font color=red size=4> <b> HPS 2016 run, February 4 to March 14, will take place on weekends only. Shifts are manned from Friday 12pm to 7am on Monday </b> </font> </center> | <center> <font color=red size=4> <b> HPS 2016 run, February 4 to March 14, will take place on weekends only. Shifts are manned from Friday 12pm to 7am on Monday </b> </font> </center> | ||
− | <center> <font color=red size=4> <b> | + | <center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> |
== RC: Stepan Stepanyan == | == RC: Stepan Stepanyan == | ||
Line 95: | Line 95: | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
− | | valign=top width= | + | | valign=top width=600 | |
== <font color=blue><b> Run Plan for February 5 - 7, 2015: </b></font>== | == <font color=blue><b> Run Plan for February 5 - 7, 2015: </b></font>== | ||
Revision as of 08:57, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, will take place on weekends only. Shifts are manned from Friday 12pm to 7am on Monday
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=1.056 GeV:Note: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |