Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 84: | Line 84: | ||
= Short Term Schedule = | = Short Term Schedule = | ||
<!--<center><font size=3>[https://bluejeans.com/843347797 Run Meeting Tomorrow, May 17, at 12:00]</font></center>--> | <!--<center><font size=3>[https://bluejeans.com/843347797 Run Meeting Tomorrow, May 17, at 12:00]</font></center>--> | ||
− | <center> <font color=red size=4> <b> HPS 2016 run, February 4 to March 14, weekends only. Shifts are manned from Friday 12pm to 7am on Monday </b> </font> </center> | + | <center> <font color=red size=4> <b> HPS 2016 run, February 4 to March 14, weekends only. </b> </font> </center> |
+ | <center> <font color=red size=4> <b> Shifts are manned from Friday 12pm to 7am on Monday. </b> </font> </center> | ||
<center> <font color=red size=4> <b> Beam energy 2.3 GeV (1 pass). </b> </font> </center> | <center> <font color=red size=4> <b> Beam energy 2.3 GeV (1 pass). </b> </font> </center> | ||
<center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | <center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | ||
Line 99: | Line 100: | ||
== <font color=blue><b> Run Plan for February 5 - 7, 2015: </b></font>== | == <font color=blue><b> Run Plan for February 5 - 7, 2015: </b></font>== | ||
− | * | + | === Locking up the hall === |
− | * Make sure experts, beamline, ECal, SVT, and slow | + | * At noon (Friday), check the status of hall work and notify RC if there are delays for lockup. Work with RC to make sure that hall is ready for sweep at 1pm. |
+ | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems, and that all clear for lockup. | ||
* Make sure all necessary monitoring GUIs are up and running. | * Make sure all necessary monitoring GUIs are up and running. | ||
* Make sure beam viewer screens are up | * Make sure beam viewer screens are up | ||
− | === | + | === Bringing beam to the hall: === |
# <b>Turn ON the ECal</b> and check for normal scalers ([https://logbooks.jlab.org/entry/3334812]) | # <b>Turn ON the ECal</b> and check for normal scalers ([https://logbooks.jlab.org/entry/3334812]) | ||
# Call SVT expert. Expert will check conditions and <b>turn ON the SVT</b> <font color=red>Only SVT expert should move the SVT!</font> | # Call SVT expert. Expert will check conditions and <b>turn ON the SVT</b> <font color=red>Only SVT expert should move the SVT!</font> | ||
Line 115: | Line 117: | ||
=== Miscellaneous Notes: === | === Miscellaneous Notes: === | ||
− | # <b> If you change beam | + | # <b> If you change beam current, turn orbit locks off first, there is a current - position dependence on the stripline BPMs 2H00 and 2H02 </b> |
− | # Do NOT change magnet currents when beam is on | + | # Do NOT change chicane magnet currents when beam is on |
− | # Do not run more than 30 minutes above 50 nA without the beam blocker | + | # Do not run more than 30 minutes above 50 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents. |
Line 152: | Line 154: | ||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
− | ===Setting up Chicane for E= | + | ===Setting up Chicane for E=2.3 GeV:=== |
− | '''Note:''' This requires | + | '''Note:''' This requires Beam Permit and NO beam to HPS / Faraday Cup. |
# Turn on chicane power supplies following instructions on the documentation page on [[Media:chicane_ON_OFF.pdf|Turning Chicane ON/OFF]] | # Turn on chicane power supplies following instructions on the documentation page on [[Media:chicane_ON_OFF.pdf|Turning Chicane ON/OFF]] | ||
− | + | ||
− | |||
===SVT Instructions:=== | ===SVT Instructions:=== |
Revision as of 09:26, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:Locking up the hall
Bringing beam to the hall:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |