− | # | + | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet, check that beam type is "photon" |
− | # | + | # Follow instructions under "Procedures" on the documentation wiki for "Beamline" to establish beam to the tagger dump first |
− | + | # Make sure nA BPMs will be calibrated while running beam to the tagger dump (depends on time of day when beam will be available for BPM calibration, consult with RC). | |
− | #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | + | # <b> After reasonable beam will be established on the tagger dump </b> |
+ | <!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | ||
#* Log errors for each DAQ crash | #* Log errors for each DAQ crash | ||
#* Use <b>v7TurboBurst-Lat147.trg</b> trigger file | #* Use <b>v7TurboBurst-Lat147.trg</b> trigger file | ||
− | # Keep an eye on beam current, and beam positions at 2H02 BPM: x = -1.78 mm , y = -0.70 mm. | + | # Keep an eye on beam current, and beam positions at 2H02 BPM: x = -1.78 mm , y = -0.70 mm. --> |
=== Miscellaneous Notes: === | === Miscellaneous Notes: === | ||
Line 157: | Line 158: | ||
'''Note:''' This requires Beam Permit and NO beam to HPS / Faraday Cup. | '''Note:''' This requires Beam Permit and NO beam to HPS / Faraday Cup. | ||
# Turn on chicane power supplies following instructions on the documentation page on [[Media:chicane_ON_OFF.pdf|Turning Chicane ON/OFF]] | # Turn on chicane power supplies following instructions on the documentation page on [[Media:chicane_ON_OFF.pdf|Turning Chicane ON/OFF]] | ||
− | |||
===SVT Instructions:=== | ===SVT Instructions:=== |
Revision as of 09:39, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:Locking up the hall
Bringing beam to the hall:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |