Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
=== Locking up the hall === | === Locking up the hall === | ||
− | * At noon (Friday), check the status of hall work and notify RC if there are delays for lockup. Work with | + | * At noon (Friday), check the status of hall work and notify RC if there are delays for lockup. Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 1pm. |
− | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems | + | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. |
* Make sure all necessary monitoring GUIs are up and running. | * Make sure all necessary monitoring GUIs are up and running. | ||
− | * Make sure beam viewer screens are up | + | * Make sure beam viewer screens are up. |
=== Bringing beam to the hall (consult with RC with any problem): === | === Bringing beam to the hall (consult with RC with any problem): === | ||
− | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet, check that beam type is "photon" | + | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet (they have procedures to set the correct current), check that beam type is "photon" on the GUI. |
− | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump | + | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. |
− | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this depends on time of day when beam | + | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this depends on the time of day when beam and experts are available for BPM calibration). |
− | # After <b> reasonable </b> beam is established on the tagger dump | + | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron dump (to Faraday cup). For "reasonable" see "Acceptable Beam Conditions" on the right column of this page, not much has been changed in beam optics from the previous run, beam profile at 2C21 harp should be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both X and Y. |
− | # Make sure that SVT collimator is on the beam | + | # Make sure that SVT collimator is on the beam when sending beam through HPS to the electron dump (Faraday cup). |
− | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. If needed move SVT protection collimator up/down (motion should not be more than a 1mm, the preset positions should be good to few hundred micrometers). | + | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. |
+ | #* If needed move SVT protection collimator up/down to see beam clearly on the viewer (motion should not be more than a 1mm, the preset positions should be good to few hundred micrometers). | ||
+ | #* Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational. | ||
<!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | <!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | ||
#* Log errors for each DAQ crash | #* Log errors for each DAQ crash |
Revision as of 11:34, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |