Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
=== Locking up the hall === | === Locking up the hall === | ||
− | * At noon (Friday), check the status of hall | + | * At noon (Friday), check the status of the activities in the hall and notify RC if there are potential delays for the lockup. Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 1pm. |
* Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | ||
+ | * When ready notify MCC to start seep and lockup of the hall. | ||
* Make sure all necessary monitoring GUIs are up and running. | * Make sure all necessary monitoring GUIs are up and running. | ||
* Make sure beam viewer screens are up. | * Make sure beam viewer screens are up. |
Revision as of 13:34, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |