− | == <font color=blue><b> Run Plan for February 5 - 7, | + | == <font color=blue><b> Run Plan for February 5 - 7, 2016: </b></font>== |
=== Locking up the hall === | === Locking up the hall === | ||
Line 112: | Line 112: | ||
# Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. | ||
# Make sure nA BPMs are calibrated while running beam to the tagger dump (this depends on the time of day when beam and experts are available for BPM calibration). | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this depends on the time of day when beam and experts are available for BPM calibration). | ||
− | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron dump (to Faraday cup). For "reasonable" | + | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron dump (to Faraday cup). For "reasonable", not much has been changed in beam optics from the previous run, beam profile at 2C21 harp should be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both X and Y. |
# Make sure that SVT collimator is on the beam when sending beam through HPS to the electron dump (Faraday cup). | # Make sure that SVT collimator is on the beam when sending beam through HPS to the electron dump (Faraday cup). | ||
# Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. In order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA. Run all studies with beam currents between 25 nA and 30 nA. | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. In order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA. Run all studies with beam currents between 25 nA and 30 nA. |
Revision as of 15:29, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |