Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 110: | Line 110: | ||
=== Bringing beam to the hall (consult with RC with any problem): === | === Bringing beam to the hall (consult with RC with any problem): === | ||
− | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet (they have procedures to set the correct current), check that beam type is " | + | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet (they have procedures to set the correct current), check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). |
# Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. | ||
− | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this | + | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this will depend on time of the day when beam and experts are available for BPM calibration). |
− | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron dump (to Faraday cup). | + | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron beam dump (to Faraday cup). Here "reasonable" means beam profile is close to the design values at 2C21 and "tagger" (2C24) harps. Not much has been changed in beam optics from the previous run, it is still 1 pass beam and we expect beam profile at 2C21 harp to be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both in X and Y. |
− | # Make sure that SVT collimator is on the beam when sending beam through HPS to the electron dump (Faraday cup). | + | # Make sure that SVT collimator is on the beam when sending the beam through HPS to the electron dump (Faraday cup). |
− | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. In order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA. | + | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. In order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA. All studies should be done with beam currents between 25 nA and 30 nA. |
#* If needed move SVT protection collimator up/down to see beam clearly on the viewer (motion should not be more than a 1mm, the preset positions should be good to few hundred micrometers). | #* If needed move SVT protection collimator up/down to see beam clearly on the viewer (motion should not be more than a 1mm, the preset positions should be good to few hundred micrometers). | ||
#* Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational. | #* Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational. | ||
+ | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ | ||
# Center beam on HPS using ECal rates (see instructions under "Procedures" on the documentation tab for "Beamline"). | # Center beam on HPS using ECal rates (see instructions under "Procedures" on the documentation tab for "Beamline"). | ||
# Mark the beam position on the chromox screen and turn on HPS chicane magnets. | # Mark the beam position on the chromox screen and turn on HPS chicane magnets. |
Revision as of 10:19, 5 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |