Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 165: | Line 165: | ||
# After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
# Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. | # Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. | ||
− | |||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
− | + | ||
===Setting up Chicane for E=2.3 GeV:=== | ===Setting up Chicane for E=2.3 GeV:=== | ||
'''Note:''' This requires Beam Permit and NO beam to HPS / Faraday Cup. | '''Note:''' This requires Beam Permit and NO beam to HPS / Faraday Cup. | ||
Line 180: | Line 179: | ||
===ECAL Instructions:=== | ===ECAL Instructions:=== | ||
− | |||
− | |||
− | |||
− | |||
*HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | *HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | ||
**Only after stable beam established to Faraday Cup can HV can be turned ON. | **Only after stable beam established to Faraday Cup can HV can be turned ON. |
Revision as of 22:05, 5 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||