Line 111: | Line 111: | ||
=== Bringing beam to the hall (consult with RC with any problem): === | === Bringing beam to the hall (consult with RC with any problem): === | ||
# First beam comes to tagger dump. Ask MCC to turn on tagger magnet (they have procedures to set the correct current), check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet (they have procedures to set the correct current), check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). | ||
− | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. | + | # Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the tagger dump. For establishing beam on the tagger dump beam current should be <10 nA. |
# Make sure nA BPMs are calibrated while running beam to the tagger dump (this will depend on time of the day when beam and experts are available for BPM calibration). | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this will depend on time of the day when beam and experts are available for BPM calibration). | ||
# After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron beam dump (to Faraday cup). Here "reasonable" means beam profile is close to the design values at 2C21 and "tagger" (2C24) harps. Not much has been changed in beam optics from the previous run, it is still 1 pass beam and we expect beam profile at 2C21 harp to be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both in X and Y. | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron beam dump (to Faraday cup). Here "reasonable" means beam profile is close to the design values at 2C21 and "tagger" (2C24) harps. Not much has been changed in beam optics from the previous run, it is still 1 pass beam and we expect beam profile at 2C21 harp to be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both in X and Y. |
Revision as of 08:05, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |