Line 115: | Line 115: | ||
# After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron beam dump (to Faraday cup). Here "reasonable" means beam profile is close to the design values at 2C21 and "tagger" (2C24) harps. Not much has been changed in beam optics from the previous run, it is still 1 pass beam and we expect beam profile at 2C21 harp to be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both in X and Y. | # After <b> reasonable </b> beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron beam dump (to Faraday cup). Here "reasonable" means beam profile is close to the design values at 2C21 and "tagger" (2C24) harps. Not much has been changed in beam optics from the previous run, it is still 1 pass beam and we expect beam profile at 2C21 harp to be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harp, both in X and Y. | ||
# Make sure that SVT collimator is on the beam when sending the beam through HPS to the electron dump (Faraday cup). | # Make sure that SVT collimator is on the beam when sending the beam through HPS to the electron dump (Faraday cup). | ||
− | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | + | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important BPMs, 2H00 and 2H02, beam current should be >25 nA<\b>. All studies should be done with beam currents between 25 nA and 30 nA. |
− | #* If needed move SVT protection collimator up/down to see beam clearly on the viewer (motion should not be more than a 1mm, the | + | #* If needed move SVT protection collimator up/down to see beam clearly on the downstream viewer (motion should not be more than a 1mm, the pre-set positions should be good to a few hundred micrometers). |
#* <b> Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational.</b> | #* <b> Before moving forward with 2H02A harp scans and beam profile tune, stripline BPMs 2H00 and 2H02 must be calibrated and orbit lock must be operational.</b> | ||
# The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. If beam profile is not exactly as required, but beam position on BPM is stable within 0.2 mm in X and 0.05mm in Y, the following still can be done: | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. If beam profile is not exactly as required, but beam position on BPM is stable within 0.2 mm in X and 0.05mm in Y, the following still can be done: |
Revision as of 08:17, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |