== <font color=blue><b> Run Plan for February 5 - 7, 2016: </b></font>== | == <font color=blue><b> Run Plan for February 5 - 7, 2016: </b></font>== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 139: | Line 132: | ||
| valign=top | | | valign=top | | ||
− | ==<font color=blue><b>General Instructions: | + | ==<font color=blue><b>General Instructions:</b></font>== |
+ | === Locking up the hall === | ||
+ | * At 2pm (Friday), check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm. | ||
+ | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | ||
+ | * When ready notify MCC to start seep and lockup of the hall. | ||
+ | * Make sure all necessary monitoring GUIs are up and running. | ||
+ | * Make sure beam viewer screens are up. | ||
+ | |||
===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== | ===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== |
Revision as of 19:01, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |