Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
− | | valign=top width= | + | | valign=top width=50% | |
== <font color=blue><b> Run Plan for February 5 - 7, 2016: </b></font>== | == <font color=blue><b> Run Plan for February 5 - 7, 2016: </b></font>== | ||
Line 133: | Line 133: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
− | === Locking up the hall === | + | === Locking up the hall on Fridays === |
− | * At 2pm | + | * At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm. |
* Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | ||
* When ready notify MCC to start seep and lockup of the hall. | * When ready notify MCC to start seep and lockup of the hall. | ||
Line 140: | Line 140: | ||
* Make sure beam viewer screens are up. | * Make sure beam viewer screens are up. | ||
+ | ===Acceptable Beam Conditions:=== | ||
+ | # <b> To establish good beam conditions</b> | ||
+ | ## <font color='red'>Make sure SVT is completely OFF (see above)</font> | ||
+ | ## First send beam to the tagger dump (ask MCC to turn ON the tagger), meanwhile turn on the Chicane (see above) | ||
+ | ## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ||
+ | ## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 should be <~0.1+/-0.05 mm, and on the tagger harp (2C24) <~0.35 +/- 0.1mm. | ||
+ | ## Halo counters UPS-L/R and TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3338763] | ||
+ | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> --> | ||
+ | #* If not, turn it on. Strictly follow the procedure in the beam line manual! | ||
+ | # <b> Before sending beam to the Faraday cup</b> | ||
+ | #* Check 3mm collimator is IN | ||
+ | #* Check HPS target is OUT | ||
+ | #* Check SVT is OUT (position 0 mm) | ||
+ | #* Check ECal HV is OFF | ||
+ | # <b> Send beam to the Faraday cup</b> | ||
+ | #* Ask MCC to establish 25 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration) | ||
+ | #* Tune beam profile with 2H02A harp scan to be wide in X-direction and narrow in Y (see ref [https://logbooks.jlab.org/entry/3337720]) | ||
+ | #* Check the beam spot on chromax viewer | ||
+ | #* The halo counter rates before HPS must be low: | ||
+ | #*# UPS-L and UPS-R few Hz/nA, | ||
+ | #*# The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA | ||
+ | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3328991] | ||
+ | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3337725] | ||
+ | #* Insert the 4um W target without turning off the beam. | ||
+ | #<b>Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. </b> | ||
===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== | ===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== | ||
Line 184: | Line 209: | ||
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} |
Revision as of 19:06, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |