# <b> To establish good beam conditions</b> | # <b> To establish good beam conditions</b> | ||
## <font color='red'>Make sure SVT is completely OFF (see above)</font> | ## <font color='red'>Make sure SVT is completely OFF (see above)</font> | ||
− | ## First send beam to the tagger dump (ask MCC to turn ON the tagger) | + | ## First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> |
## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ||
## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 should be <~0.1+/-0.05 mm, and on the tagger harp (2C24) <~0.35 +/- 0.1mm. | ## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 should be <~0.1+/-0.05 mm, and on the tagger harp (2C24) <~0.35 +/- 0.1mm. |
Revision as of 19:08, 6 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |