Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 130: | Line 130: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
=== Locking up the hall on Fridays === | === Locking up the hall on Fridays === | ||
− | * At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm. | + | * At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. |
+ | * Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm: vacuum is good, magnet power supplies are turned ON and on remote, LCW is on. | ||
* Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | * Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems befor the lockup. | ||
* When ready notify MCC to start seep and lockup of the hall. | * When ready notify MCC to start seep and lockup of the hall. |
Revision as of 10:38, 11 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 7 - 8, 2016:Beam is off and seep starts at 6:45 am on Monday, February 8.Beam to FC (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |