Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 141: | Line 141: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
# <b> To establish good beam conditions: </b> | # <b> To establish good beam conditions: </b> | ||
− | #* <font color='red'>Make sure SVT is completely OFF | + | #* <font color='red'>Make sure SVT is retracted and completely OFF </font> |
#* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | #* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | ||
#* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). | #* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). |
Revision as of 14:02, 11 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |