Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 94: | Line 94: | ||
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
− | == PDL: | + | == PDL: Stepan Stepanyan == |
Line 139: | Line 139: | ||
#* Once at 0.5 mm, record no target run,occupancy and tracking performance,and APV pulse shape timing study | #* Once at 0.5 mm, record no target run,occupancy and tracking performance,and APV pulse shape timing study | ||
− | # Record Data with 4um target at 0.5 mm at several currents with | + | # Record Data with 4um target at 0.5 mm at several currents with v6_200nAtrig. Save scalers, trigger gui, FADC display gui each run. Be sure to follow general guidelines: |
+ | Do one 2H02 harp scan per shift; Fill out BTA; Monitor BPM 2H02 carefully to insure stable beams. If beams are not stable, get MCC to fix! | ||
+ | |||
#* 1-2 hour run at 200 nA | #* 1-2 hour run at 200 nA | ||
#* 1-2 hour run at 235 nA | #* 1-2 hour run at 235 nA | ||
#* 1-2 hour run at 270 nA | #* 1-2 hour run at 270 nA | ||
− | # Record 1-2 hour run with FEE trigger (ask Nathan and Ecal Expert to come in for this) | + | # Record 1-2 hour run with FEE trigger (ask Nathan and Ecal Expert to come in for this Sunday day or swing) |
#* Sunday Day or Swing shift, tell MCC we want to work on vertical beam size with Mike Tiefenbach or Arne Freyberger. Goal is to get sigma y < 50um, sigma x <200 um. | #* Sunday Day or Swing shift, tell MCC we want to work on vertical beam size with Mike Tiefenbach or Arne Freyberger. Goal is to get sigma y < 50um, sigma x <200 um. | ||
+ | |||
#*If time remains, resume regular data taking at 200 nA for remainder of weekend. | #*If time remains, resume regular data taking at 200 nA for remainder of weekend. | ||
Revision as of 21:23, 20 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: John Jaros (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for February 19 - 22, 2016:Start close-up of the Hall at 3pm on Friday, February 19 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Do one 2H02 harp scan per shift; Fill out BTA; Monitor BPM 2H02 carefully to insure stable beams. If beams are not stable, get MCC to fix!
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |