Line 168: | Line 168: | ||
#* ECal HV is OFF | #* ECal HV is OFF | ||
# <b> Send beam to the Faraday cup</b> | # <b> Send beam to the Faraday cup</b> | ||
− | # Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA</b>. All studies should be done with beam currents between 25 nA and 30 nA. | + | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA</b>. All studies should be done with beam currents between 25 nA and 30 nA. |
#* Ask MCC to establish 25 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=~0.,Y=~0.). on 2H02(X=-0.7, Y=-1.2). Use the 2.25 mm SVT collimator. </font></b>. | #* Ask MCC to establish 25 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=~0.,Y=~0.). on 2H02(X=-0.7, Y=-1.2). Use the 2.25 mm SVT collimator. </font></b>. | ||
#* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ,~ 0.05 for physics running, and the tilt angle <15 degrees. | #* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ,~ 0.05 for physics running, and the tilt angle <15 degrees. | ||
Line 183: | Line 183: | ||
# SVT HV will trip off automatically | # SVT HV will trip off automatically | ||
# Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | ||
− | #* If it was not an HPS halo counter trip, MCC will restore the beam as usual (following their own instructions). | + | #* If it was not an HPS halo counter trip, MCC will restore the beam as usual (following their own instructions). As soon beam is back and stable, restore SVT HV. |
− | #* If it was an HPS halo counter trip, MCC will not restore the beam. | + | #* If it was an HPS halo counter trip, MCC will not restore the beam. Inform MCC that we will get back to them when we are ready for beam. |
#*# Retract the SVT to its 1.5 mm stations, both top and bottom. | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
#*# Tell MCC we are ready for beam. | #*# Tell MCC we are ready for beam. | ||
Line 204: | Line 204: | ||
# '''After''' "Prestart" but '''before''' "Go", [https://logbooks.jlab.org/entry/3337933 Check ECal Latency] | # '''After''' "Prestart" but '''before''' "Go", [https://logbooks.jlab.org/entry/3337933 Check ECal Latency] | ||
# After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
− | # Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. | + | # Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs] |
+ | # After each run execute this script (replace RunNb by the actual run number): | ||
+ | #* ssh hpsrun@clondaq5 | ||
+ | #* > hps2tape.sh RunNb | ||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
Line 213: | Line 216: | ||
===SVT Instructions:=== | ===SVT Instructions:=== | ||
#<font color='red'>Turn SVT completely OFF (Bias, FEB, Flange) when entering Beam Permit.</font> | #<font color='red'>Turn SVT completely OFF (Bias, FEB, Flange) when entering Beam Permit.</font> | ||
− | #Before sending beam to Faraday cup, verify (and page SVT expert if otherwise): | + | # Before sending beam to Faraday cup, verify (and page SVT expert if otherwise): |
#* SVT should be open: "Position" at 0.000 mm in the main scaler_hps GUI | #* SVT should be open: "Position" at 0.000 mm in the main scaler_hps GUI | ||
#* SVT HV is off: all red/green indicators RED in SVT bias GUI | #* SVT HV is off: all red/green indicators RED in SVT bias GUI | ||
− | #The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | + | # The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. |
===ECAL Instructions:=== | ===ECAL Instructions:=== | ||
Line 222: | Line 225: | ||
**Only after stable beam established to Faraday Cup can HV can be turned ON. | **Only after stable beam established to Faraday Cup can HV can be turned ON. | ||
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | ||
− | |||
|} | |} |
Revision as of 16:08, 26 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, February 26 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |