Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 107: | Line 107: | ||
# Take a screenshot of the ECal scaler for reference when beam is established at the tagger (only Feb 26) | # Take a screenshot of the ECal scaler for reference when beam is established at the tagger (only Feb 26) | ||
== Bring beam to FC: == | == Bring beam to FC: == | ||
− | # <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on | + | # <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). |
+ | # <font color=red> Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.25 mm SVT collimator is in. All beam studies should be done with beam currents between 25 nA and 30 nA and all detectors OFF and SVT fully retracted.</font></b> | ||
# The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. <b> Do not waste too much time on the initial beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. <b> Do not waste too much time on the initial beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> | ||
# Set beam position | # Set beam position | ||
Line 157: | Line 158: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
# <b> To establish good beam conditions: </b> | # <b> To establish good beam conditions: </b> | ||
− | #* <font color='red'>Make sure SVT is retracted and completely OFF </font> | + | #* <font color='red'><b>Make sure SVT is retracted and completely OFF and ECal is OFF as well </b></font> |
#* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | #* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | ||
#* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). | #* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). |
Revision as of 09:16, 28 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Raphael Dupre (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, February 26 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |