Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 158: | Line 158: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
# <b> To establish good beam conditions: </b> | # <b> To establish good beam conditions: </b> | ||
− | #* <font color='red'><b>Make sure SVT is retracted and | + | #* <font color='red'><b>Make sure SVT is retracted and both SVT and ECAL are OFF.</b></font> |
#* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | #* First send beam to the tagger dump (ask MCC to turn ON the tagger magnet). <!-- meanwhile turn on the Chicane (see above) --> | ||
#* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). | #* Check that beam type is "Photon" on the BTA GUI (can be opened from "Beam" GUI). |
Revision as of 16:25, 2 March 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell (Bluejeans info for Run Meetings on Thursdays and Fridays at 2pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |