Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 183: | Line 183: | ||
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be 50 nA.</b> | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be 50 nA.</b> | ||
#* Ask MCC to establish 50 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | #* Ask MCC to establish 50 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | ||
− | #* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width | + | #* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ~0.05 for physics running, and the tilt angle <15 degrees. |
#* Check the beam spot on chromax viewer | #* Check the beam spot on chromax viewer | ||
#* The halo counter rates before HPS must be low: | #* The halo counter rates before HPS must be low: | ||
Line 196: | Line 196: | ||
# SVT HV will trip off automatically | # SVT HV will trip off automatically | ||
# Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | ||
− | #* If it was not an HPS halo counter trip, MCC | + | #* If it was not an HPS halo counter trip, MCC should restore the beam on their own. As soon beam is back and stable, restore SVT HV. |
− | #* If it was an HPS halo counter trip, MCC will not restore the beam. Inform MCC that we will get back to them when we are ready for beam. | + | #* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Inform MCC that we will get back to them when we are ready for beam. |
#*# Retract the SVT to its 1.5 mm stations, both top and bottom. | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
#*# Tell MCC we are ready for beam. | #*# Tell MCC we are ready for beam. |
Revision as of 18:59, 2 March 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on Thursdays and Fridays at 2pm
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:To establish good beam conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |