Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 234: | Line 234: | ||
# The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | # The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | ||
+ | <!-- | ||
===ECAL Instructions:=== | ===ECAL Instructions:=== | ||
*HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | *HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | ||
**Only after stable beam established to Faraday Cup can HV can be turned ON. | **Only after stable beam established to Faraday Cup can HV can be turned ON. | ||
*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | *HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position. | ||
+ | --> | ||
|} | |} |
Revision as of 19:08, 2 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:To establish good beam conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |