Line 208: | Line 208: | ||
#*# Resume data taking. | #*# Resume data taking. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<!-- | <!-- | ||
===Setting up Chicane for E=2.3 GeV:=== | ===Setting up Chicane for E=2.3 GeV:=== | ||
Line 248: | Line 230: | ||
|} | |} | ||
+ | |||
+ | |||
+ | ===Every Shift:=== | ||
+ | # Follow run plan as outlined by RC | ||
+ | # If any concern about beam stability, ask MCC if orbit locks are on (they should be). | ||
+ | # Keep shift summary up to date in HBLOG. Record all that happens. | ||
+ | #* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | ||
+ | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
+ | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
+ | # Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) | ||
+ | # '''With any issue contact On-Call Experts or RC''' | ||
+ | |||
+ | ===Every Run:=== | ||
+ | <!--# '''After''' "Prestart" but '''before''' "Go", [https://logbooks.jlab.org/entry/3337933 Check ECal Latency]--> | ||
+ | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
+ | # Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs] | ||
+ | # After each run execute this script (replace RunNb by the actual run number): | ||
+ | #* ssh hpsrun@clondaq5 | ||
+ | #* > hps2tape.sh RunNb | ||
+ | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
+ | |||
Revision as of 19:39, 2 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, Weekends Only
Shifts are manned from Friday 3pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
|
Every Shift:
- Follow run plan as outlined by RC
- If any concern about beam stability, ask MCC if orbit locks are on (they should be).
- Keep shift summary up to date in HBLOG. Record all that happens.
- Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
- Document any beam condition change and send scaler GUIs to HBLOG
- Fill and submit the shift checklist in the logbook
- Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer)
- With any issue contact On-Call Experts or RC
Every Run:
- After "Go": Check SVT Occupancy
- Update the run spreadsheet on Google Docs
- After each run execute this script (replace RunNb by the actual run number):
- ssh hpsrun@clondaq5
- > hps2tape.sh RunNb
- See the whiteboard for everything else that should be done on a per-run basis.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |