Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 116: | Line 116: | ||
# Set beam position | # Set beam position | ||
#* Have MCC move beam to standard values (see "General instructions" on the right) | #* Have MCC move beam to standard values (see "General instructions" on the right) | ||
− | #* Perform a SVT wire scan | + | #* <strike>Perform a SVT wire scan |
#* Ask for the beam to be moved up by 100um at 2H02 | #* Ask for the beam to be moved up by 100um at 2H02 | ||
#* Repeat and record 2H02 harp scan, SVT wire scan and BPM values. | #* Repeat and record 2H02 harp scan, SVT wire scan and BPM values. | ||
− | #* Scan of the 2.82 mm collimator and re-center it. Record the new position have it entered into the epics data base.See https://logbooks.jlab.org/entry/3379405 | + | #* Scan of the 2.82 mm collimator and re-center it. Record the new position have it entered into the epics data base.See https://logbooks.jlab.org/entry/3379405</strike> |
# Restore ECal and Trigger | # Restore ECal and Trigger | ||
#* Turn on ECal | #* Turn on ECal |
Revision as of 13:07, 3 March 2016
[edit]
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to March 14, Weekends Only
Shifts are manned from Friday 3pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for February 26 - 29, 2016:Start close-up of the Hall at 3pm on Friday, March 4
When hall reaches "Beam Permit", turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Recovering from beam trips when running SVT at 0.5 mm:
| |
---|---|
Every Shift:
|
Every Run:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |