Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 102: | Line 102: | ||
=== <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. </font> === | === <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. </font> === | ||
− | |||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == Run Plan July | + | == Run Plan July 12-14, 2019 == |
Hot items: | Hot items: | ||
Line 124: | Line 115: | ||
Schedule and plans: | Schedule and plans: | ||
− | # Plan to re-establish beam to Hall B | + | # Plan to re-establish beam to Hall B for HPS. Follow "General Guidelines" on the right and the Beamline Procedures and Manual on the shift documentation page. |
# Perform collimator scan to make sure the beam is centered on the collimator. Call beamline expert. | # Perform collimator scan to make sure the beam is centered on the collimator. Call beamline expert. | ||
Line 157: | Line 148: | ||
# remember to do HARP scans of 2H01 and 2H02 every shift! | # remember to do HARP scans of 2H01 and 2H02 every shift! | ||
− | <!-- | + | <!-- . --> |
<!--# SVT Setting (call SVT expert in) | <!--# SVT Setting (call SVT expert in) | ||
Line 183: | Line 174: | ||
#* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | #* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | ||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
− | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side. | + | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numers are correct. If numbers are incorrect edit the entry. |
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
Revision as of 12:54, 12 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
Run Plan July 12-14, 2019Hot items:
Schedule and plans:
Every Shift:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |