Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 373: | Line 373: | ||
<center> | <center> | ||
= Phone Numbers = | = Phone Numbers = | ||
− | |||
<font size=3> | <font size=3> | ||
{| class=wikitable cellpadding="10" cellspacing="0" style="border-left:3px solid gray;border-right:3px solid gray;border-bottom:1px solid gray;" | {| class=wikitable cellpadding="10" cellspacing="0" style="border-left:3px solid gray;border-right:3px solid gray;border-bottom:1px solid gray;" | ||
Line 414: | Line 413: | ||
|style="border-bottom:3px solid gray;"| Hall-B Gas Shed ||style="border-bottom:3px solid gray;"| 7115 | |style="border-bottom:3px solid gray;"| Hall-B Gas Shed ||style="border-bottom:3px solid gray;"| 7115 | ||
|} | |} | ||
− | </font | + | </font> |
<headertabs /> | <headertabs /> |
Revision as of 18:17, 10 December 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 10 - 18, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=1.056 GeV:Note: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |