Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 107: | Line 107: | ||
− | === Bringing beam to the hall: === | + | === Bringing beam to the hall (consult with RC with any problem): === |
# First beam comes to tagger dump. Ask MCC to turn on tagger magnet, check that beam type is "photon" | # First beam comes to tagger dump. Ask MCC to turn on tagger magnet, check that beam type is "photon" | ||
− | # Follow instructions under "Procedures" on the documentation | + | # Follow instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the tagger dump first. |
− | # Make sure nA BPMs | + | # Make sure nA BPMs are calibrated while running beam to the tagger dump (this depends on time of day when beam will be available for BPM calibration). |
− | # <b> After reasonable beam | + | # <b> After reasonable beam is established on the tagger dump ask MCC to degauss the tagger magnet and deliver beam to the Hall-B electron dump (to Faraday cup). For "reasonable" see "Acceptable Beam Conditions" on the right column of this page, not much is changed in beam optics from the previous run, beam profile at 2C21 should be < 0.1 mm and < 0.4 mm on 2C24 (tagger) harps, both X and Y.</b> |
+ | # Follow the instructions under "Procedures" on the documentation tab for "Beamline" to establish beam to the electron dump. If needed move SVT protection collimator up/down (motion should not be more than a 1mm | ||
<!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | <!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | ||
#* Log errors for each DAQ crash | #* Log errors for each DAQ crash |
Revision as of 10:10, 4 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 12pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2015:Locking up the hall
Bringing beam to the hall (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |