Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 106: | Line 106: | ||
# The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as halo rates are low: Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following still can be done:</b> | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as halo rates are low: Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following still can be done:</b> | ||
#* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | #* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | ||
− | #* Mark the beam position on the chromox screen (make a screen shot and log entry) and turn on HPS chicane magnets. Due to stray fields vertical position may not come back at | + | #* Mark the beam position on the chromox screen (make a screen shot of the viewer and a log entry) and turn on HPS chicane magnets. Due to stray fields vertical position may not come back at the same spot, <b> do not try to steer vertically</b>. If horizontal position is off, it indicates that relation between field (current) settings of Frascati and analyzing magnet are not correct. <b> At this point no need for an adjustment, just record the shift (make a screen shot of the viewer and a log entry) and settings, and move forward</b>. |
#* Study rates on ECal channels as a function of beam current without and with production target (4 um W). Do not exceed 1.3 MHz rate in an individual ECal channel. | #* Study rates on ECal channels as a function of beam current without and with production target (4 um W). Do not exceed 1.3 MHz rate in an individual ECal channel. | ||
#* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. |
Revision as of 18:15, 7 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 5 - 7, 2016:Beam to FC (consult with RC with any problem):
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |