Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 112: | Line 112: | ||
<!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | <!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | ||
#* Check fast beam motion using struck scaler system. Call Rafayel Paremuzyan. --> | #* Check fast beam motion using struck scaler system. Call Rafayel Paremuzyan. --> | ||
− | # | + | # Start trigger rates studies, establish running conditions. |
# If beam stability and profile are acceptable: | # If beam stability and profile are acceptable: | ||
#* call SVT expert to turn SVT ON and check occupancies | #* call SVT expert to turn SVT ON and check occupancies | ||
#* start centering it on HPS SVT using SVT wires (see instructions under "Procedures" on the documentation tab for "Beamline"). | #* start centering it on HPS SVT using SVT wires (see instructions under "Procedures" on the documentation tab for "Beamline"). | ||
− | |||
<!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | <!-- #* Check if DAQ runs properly and if all monitors look reasonable on both SVT and ECal (call experts) | ||
#* Log errors for each DAQ crash | #* Log errors for each DAQ crash | ||
Line 123: | Line 122: | ||
=== Miscellaneous Notes: === | === Miscellaneous Notes: === | ||
− | |||
− | |||
# Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents. | # Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents. | ||
Revision as of 15:27, 11 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Stepan Stepanyan (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |