Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 90: | Line 90: | ||
<center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | <center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | ||
− | == RC: | + | == RC: Takashi Maruyama (<font size=3>[https://bluejeans.com/656177054 Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm]</font>) == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 103: | Line 103: | ||
<!-- == Beam is off and seep starts at 6:45 am on Monday, February 15. == --> | <!-- == Beam is off and seep starts at 6:45 am on Monday, February 15. == --> | ||
== Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right) == | == Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right) == | ||
+ | == After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right) == | ||
== Establish beam to the tagger dump (see "General instruction" on the right) == | == Establish beam to the tagger dump (see "General instruction" on the right) == | ||
== Bring beam to FC: == | == Bring beam to FC: == | ||
Line 108: | Line 109: | ||
# The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as halo rates are low: Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following still can be done:</b> | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as halo rates are low: Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following still can be done:</b> | ||
#* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | #* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | ||
− | |||
# Study rates on ECal channels for (make a log entry of HPS scaler GUI for each condition): | # Study rates on ECal channels for (make a log entry of HPS scaler GUI for each condition): | ||
#* as a function of beam current without and with production target (4 um W). | #* as a function of beam current without and with production target (4 um W). |
Revision as of 16:04, 11 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |