Line 108: | Line 108: | ||
# Turn on the chicane magnets. No need for straight through beam. | # Turn on the chicane magnets. No need for straight through beam. | ||
# <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged. For orbit lock positions on <font color=red> 2H00(X=~0.,Y=~0.). on 2H02(X=0.4,Y=-0.7). The new positions for collimator at this beam position are: 3.94 mm at 6.198, 2.82 mm at 5.03. Due to higher rates on halo counters we will run with 3.94 mm collimator. </font></b>. All studies should be done with beam currents between 25 nA and 30 nA. | # <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged. For orbit lock positions on <font color=red> 2H00(X=~0.,Y=~0.). on 2H02(X=0.4,Y=-0.7). The new positions for collimator at this beam position are: 3.94 mm at 6.198, 2.82 mm at 5.03. Due to higher rates on halo counters we will run with 3.94 mm collimator. </font></b>. All studies should be done with beam currents between 25 nA and 30 nA. | ||
− | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as halo | + | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> |
#* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | #* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | ||
# Study rates on ECal channels for (make a log entry of HPS scaler GUI for each condition): | # Study rates on ECal channels for (make a log entry of HPS scaler GUI for each condition): | ||
Line 114: | Line 114: | ||
#* for different collimators (3.94 mm, 2.82 mm, and 2.25 mm) without and with target | #* for different collimators (3.94 mm, 2.82 mm, and 2.25 mm) without and with target | ||
<!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | <!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | ||
− | + | --> | |
# Start trigger rates studies, establish running conditions (see instructions under "Procedures" on the documentation tab for "Trigger"). | # Start trigger rates studies, establish running conditions (see instructions under "Procedures" on the documentation tab for "Trigger"). | ||
+ | #* Take parasitic data on fast beam motion using struck scaler system. Call Rafayel Paremuzyan if it is between 8am and 10pm. | ||
# If beam stability and profile are acceptable: | # If beam stability and profile are acceptable: | ||
+ | #* start centering the beam on HPS SVT using the SVT wires (see instructions under "Procedures" on the documentation tab for "Beamline"). | ||
#* call SVT expert to turn SVT ON and check occupancies | #* call SVT expert to turn SVT ON and check occupancies | ||
− | + | ||
− | |||
− | |||
− | |||
− | |||
=== Miscellaneous Notes: === | === Miscellaneous Notes: === |
Revision as of 16:11, 11 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |